Following renewable energy devices & parts for their manufacture
(a) Bio-gas plant
(b) Solar power based devices
(c) Solar power generating system
(d) Wind mills, Wind Operated Electricity Generator (WOEG)
(e) Waste to energy plants / devices
(f) Solar lantern / solar lamp
(g) Ocean waves/tidal waves energy devices/plants
(h) Photo voltaic cells, whether or not assembled in modules or made up into panels
Explanation: If the goods specified in this entry are supplied, by a supplier, along with supplies of other goods and services, one of which being a taxable service specified in the entry at S. No. 38 of the Table mentioned in the notification No. 8/2017-Integrated Tax (Rate), dated 28th June, 2017 [G.S.R. 683(E)], the value of supply of goods for the purposes of this entry shall be deemed as seventy per cent. of the gross consideration charged for all such supplies, and the remaining thirty per cent. of the gross consideration charged shall be deemed as value of the said taxable service.
Following renewable energy devices & parts for their manufacture
(a) Bio-gas plant
(b) Solar power based devices
(c) Solar power generating system
(d) Wind mills, Wind Operated Electricity Generator (WOEG)
(e) Waste to energy plants / devices
(f) Solar lantern / solar lamp
(g) Ocean waves/tidal waves energy devices/plants
(h) Photo voltaic cells, whether or not assembled in modules or made up into panels
Following renewable energy devices & parts for their manufacture
(a) Bio-gas plant
(b) Solar power based devices
(c) Solar power generating system
(d) Wind mills, Wind Operated Electricity Generator (WOEG)
(e) Waste to energy plants / devices
(f) Solar lantern / solar lamp
(g) Ocean waves/tidal waves energy devices/plants
Following renewable energy devices & parts for their manufacture
(a) Bio-gas plant
(b) Solar power based devices
(c) Solar power generating system
(d) Wind mills, Wind Operated Electricity Generator (WOEG)
(e) Waste to energy plants / devices
(f) Solar lantern / solar lamp
(g) Ocean waves/tidal waves energy devices/plants
☑ Quarterly | QRMP
Last date for opt-in / opt-out QRMP Scheme for quarter Apr - June 2025 (Rule 61A)